Network features
• Metro tracks (main) : 4;
• Network lenght : 69.25 km double rail;
• Depot: 4;
• Stations No. : 51;
• Average distance between two stations: 1.5 km;
• Station's lenght : 135 – 175 m;
• Station average depth: 12 m;
• Gauge : 1432 mm;
• AFC with magnetic card from 1995, upgraded on 2000. From 2006, togheter with RATB an functional platform was made to allow commun transport titles, this beeing first phase of Metro-RATB tariff integration.
Operation Park:
• 44 trains typ Bombardier type
• 33 trains IVA type
Operation interval :
|
Lane 1 |
Lane 2 |
Lane 3 |
Lane 4 |
On rush hours:
07:00 - 09:30; 16:00 - 20:00 |
6-7 min. |
3-5 min. |
6-7 min. |
7 min. |
Rest of the day |
8 min. |
9 min. |
8 min. |
10 min. |
Lane 1 (M1): |
Pantelimon – Eroilor – Dristor 2 |
Lane 3 (M3): |
Anghel Saligny – Eroilor – Preciziei |
Lane 2 (M2): |
Berceni - Pipera |
Lane 4 (M4): |
Gara de Nord 2 – Parc Bazilescu |